Western Maryland Rail Trail — Big Pool before Licking Creek Bridge
Maryland · Rail-trail
The eastern part of the Western Maryland Rail Trail offers an ordinary pedal-bike ride through the Potomac valley on an improved former railway. The manager describes easy grades suitable for families and new recreational riders. A March 2025 DNR report confirms completed resurfacing of 22.5 miles; that is useful evidence of completed work, rather than a promise about the condition of every section today.
Plan your ride
- Location
- Big Pool · Maryland
- Ride length
- About5miles main return plus parking walk
- Ride format
- Out and back
- Surface
- Paved eastern main trail; western ramps and unpaved bypass excluded.
- Road crossings
- Walk from Big Pool parking to the main trail. Stop, dismount and walk the Ernstville Road at-grade crossing only when traffic is clear, or turn back before it. Turn before Licking Creek rail-trail bridge; the nearby road overpass is a different feature.
- Elevation
- The manager describes an easy grade suitable for families and some users with limited mobility. This is not a measured current slope or parking-access certificate; other western bypass ramps are outside this outing.
- Starting location
- Western Maryland Rail Trail Big Pool Parking, Big Pool Road, Big Pool, MD
About five miles for the main return, interpreted from the owner’s activity booklet and bridge location beyond mile 2. This is not five miles each way. The parking walk is extra and the before-bridge turn changes the distance slightly.
Approximate named public facility/access-area reference. Follow the guide to designated public visitor parking and the signed path; not a surveyed stall.
Western Maryland Rail Trail — Big Pool before Licking Creek Bridge — detailed guide
Source review: 2026-10-16. A dated source review does not guarantee current-day conditions.
About five miles out and back on the main trail, plus the parking walk. Maryland DNR publishes a Big Pool–Licking Creek Bridge outing on the paved rail trail. This original guide follows that named course, stopping before the bridge and returning the same way. It includes an at-grade road crossing where you should stop and walk your bicycle. The editorial draft is complete but remains unpublished, with fresh operating checks still required.
The eastern part of the Western Maryland Rail Trail offers an ordinary pedal-bike ride through the Potomac valley on an improved former railway. The manager describes easy grades suitable for families and new recreational riders. A March 2025 DNR report confirms completed resurfacing of 22.5 miles; that is useful evidence of completed work, rather than a promise about the condition of every section today.
Proposed arrival and course
Start at the Western Maryland Rail Trail’s designated Big Pool parking lot along Big Pool Road, Maryland Route 56. The manager’s driving directions place the eastern trailhead approximately a quarter mile east of I-70 exit 12, on the right when traveling toward Fort Frederick State Park, across from the post office. The lot is on the southwest side of Route 56, between the highway and the rail-trail corridor. Use its marked entrance rather than the post-office lot or a residential driveway. The Fort Frederick address shown as the trail’s administrative contact is a different arrival.
Walk your bicycle northwest through the lot toward its restroom and historic-building end. Take the short public paved connection on the back, southwestern side of the lot to the main rail trail, then head northwest toward Hancock. The lot and main path are on the same side of Route 56, so this arrival does not require crossing that highway. The aisles carry vehicles; the approach is not a protected walk from every space. July 2025 public road imagery and the aerial lot layout support this arrival, while current signs and barriers still control its use. Charging equipment does not establish an ordinary parking tariff.
Follow the rail trail’s own mile markers through mile one and mile two. The early historic Ernstville Road bridge described in DNR’s booklet does not remove every road interface on this outing. Farther along, Ernstville Road also crosses the trail at grade. October 2024 public Street View shows paved trail entrances, stop markings, barriers and roadside pedestrian-warning signs on both sides of that separate crossing. Stop, dismount, check traffic in both directions and walk across only when it is clear. This is not a promised signal-controlled or protected crossing. Turn back before it if the crossing is outside your comfort level.
Stay on the paved WMRT after the crossing. Do not follow Ernstville Road toward houses, take a farm access road, or descend to the C&O towpath. Nearby tracks and railway property are not a shortcut. Use current signs at all service entrances and path junctions; this guide does not certify the absence of maintenance vehicles.
DNR’s activity booklet identifies Licking Creek Bridge as the first rail-trail bridge after mile two. On the eastern approach, turn before entering the bridge, at a clear place where you can check behind you and avoid blocking other visitors. Turn earlier if the approach is crowded, narrowed, fenced or signed closed. The separate Licking Creek Aqueduct belongs to the C&O Canal corridor closer to the river; a map search for the bridge may select that aqueduct instead. Do not leave the WMRT to reach it. Retrace the same paved course, walking the Ernstville Road crossing and the Big Pool parking approach again.
The booklet calls this a five-mile exploration. Its named bridge and the linked map’s position between rail-trail mile markers two and three support about five miles for the return outing. That is an interpretation of the owner’s outing, not a newly surveyed measurement. Turning before the bridge changes the distance slightly, and the walk from your particular parking space is extra and unmeasured. No exact navigation track, surveyed turn pad or parking pin is supplied.
The owner map uses different symbols for Western Maryland Rail Trail mileposts and the parallel C&O Canal’s mileage. A canal mile number is not a rail-trail distance marker. The map and activity booklet are older source documents, not a current inspection of every marker, approach or bridge.
Keep the outing comfortable
This ride uses the eastern paved main path and the easy grade described by its manager. That qualitative description does not provide a measured maximum slope, accessible parking approach or current bridge-transition certificate. Give walkers room, keep right and pass on the left when it is safe. DNR’s activity booklet confirms that riding convention. Take drinking water; mapped or visible restrooms do not guarantee that they are open or serviced when you arrive. Traffic on nearby I-70 can be audible even though this course does not ride on the interstate.
The route operates from sunrise to sunset. Finish with enough daylight to return to the car and follow any more specific local signs or temporary restrictions. Current parking or entry charges for this rail-trail start remain unresolved. The separate Fort Frederick park’s vehicle admission charge should not automatically be applied to the Big Pool rail-trail lot.
The full rail trail is described as approximately 28 miles. This short outing does not cover that whole distance or visit the closed Indigo Tunnel. Farther west, the official route bypasses that tunnel using ramps to the unpaved C&O towpath, which can be muddy after rain. The whole regional route should not be described as uninterrupted pavement.
Evidence and remaining checks
Research checked October 16, 2026. The current DNR trail, visitor-information and trail-section pages were read, together with the applicable state dashboard entry. The dashboard lists Fort Frederick as open but does not provide a named WMRT all-clear. The 2025 resurfacing report establishes completed work, not present clearance of every barrier or road approach. The guide uses ordinary pedal bicycles; it does not transfer federal towpath rules or other e-bike classes onto this state-managed outing.
Before publication and before riding, refresh the actual Big Pool lot terms, posted hours and fees, the signed walking connection, Ernstville Road controls, pavement, services and clear turning space before the rail-trail bridge. Stop or shorten the outing for posted work or unsafe conditions. The dated imagery reviewed here is context rather than a current physical inspection. USA website integration and launch approval remain outstanding.
Sources: the current trail manager page, its visitor directions, the owner-linked map, DNR’s activity booklet and the March 2025 completed repaving report.
