Erwin Linear Trail
Tennessee · Greenway
A normally easy creekside greenway through Erwin, currently included for statewide completeness and recovery tracking.
Access note. Temporarily closed due to Hurricane Helene damage. Treat this as a watch-list route, not a ride-ready option.
Plan your ride
- Location
- Erwin · Tennessee
- Ride length
- 4.3 mi
- Ride format
- One way / out & back
- Surface
- Asphalt
- Road crossings
- The route parallels I-26 and waterways through town, but should not be planned until the closure is lifted.
- Elevation
- Mostly flat
- Starting location
- Erwin Linear Trail, 110 N Industrial Dr, Erwin, TN
linear creek and river corridor
Existing Tennessee simplified route; verify the listed entrance.
Manager information
Current TrailLink closure notice
